2021.03.05 / by / Tags: CUSTOMER Share
In the process of packing and packing the steel structure, we should pay attention to the following six points:
(1) Small parts and spare parts in steel structure products (generally referring to mounting bolts, washers, connecting plates, joint angles, etc.) should be boxed or bundled, and a packing list should be provided. The box number, serial number, component name, gross weight, net weight and other relevant information should be marked on the box.
(2) Iron boxes are generally used in field projects. The box body is welded with steel plates and is not easy to loose the box. At the installation site, the box body steel plates can be used as installation pads and temporary fixing parts. The outer shell of the box body should be welded with lifting lugs.
(3) The box body of the wooden box should be firm and rainproof, and there should be forklift holes underneath the sleepers that can bear the total weight of the box. The two ends of the sleepers should be cut into inclined planes for tying or transporting. The weight is generally not more than 1T.
(4) Bundling is generally used to transport slender components that are relatively close, such as the rods of the net frame, the brace of the roof truss, etc. The weight of each bundle in the strapping should not be too large, and the sling should not be directly tied to the wire.
(5) The packaging should be carried out after the coating is dried. The packaging should protect the component coating from damage and ensure that the components and parts are not deformed, lost, or damaged.
(6) Steel structure products are installed immediately after production. Small parts and spare parts can be directly tied to the required parts of the steel structure without packing them, but they must be tied firmly or fixed with bolts, and will not affect the transportation and installation.
All in all, it is necessary to make reasonable use of space in the export packing process of the steel structure. For ordinary steel columns and steel beams, loading is relatively simple, but for non-standard special-shaped steel components, it is not as simple as we imagined. Protect the components from being damaged or crushed, and we also need to figure out how to save cabinets.
For non-standard components, due to their irregularity, a reasonable layout plan is required, reasonable packing, and the deployment of boxes under the condition of protecting the safety of the components. If the components are flattened, deformed, etc., the materials may be scrapped and cannot be installed on-site. Therefore, the steel structure export container must be safe.
For more information, please contact us!