As we all know, our country is known as the “infrastructure maniac”. In the field of infrastructure construction, our construction technology is in the forefront of the world, and steel structure construction is one of them. my country is a big country in the steel structure industry and has a mature production chain. We have accumulated rich process technology and construction technology from R&D design to manufacturing and installation.
In recent years, with the vigorous support of my country’s policies, more and more steel structure companies have developed steel structure export trade business. With the rise of the export of steel structures, more and more questions have followed, including what is the export process, what is the installation plan, and what are the differences between them and domestic ones? Today we are going to talk about this series of issues.
First,Chinese Prefab Warehouse Exporters are subject to customs filing and approval. The packaging style of the goods is very different from our domestic packaging style. When exporting, due to the long distance, many transshipments are required, so when exporting goods, we must use closed boxes such as containers to load the goods. In China, open-top trucks can be used, and after the goods are loaded and fixed, they can be directly transported to the destination. In addition, we also put desiccant in the prefabricated steel components to control the humidity at sea and avoid corrosion of the steel structure.
After Chinese Prefab Warehouse Exporters sign contracts with foreign customers, the company will send engineers to the customer’s construction site on the eve of the steel structure entering the construction site to guide the construction personnel to complete the preliminary preparations. These include: pre-embedded parts treatment, pouring concrete, foundation elevation, covering the bolts with plastic wrap, protecting the bolts from rusting, and returning the soil to ram the ground. After the steel structure enters the construction site, the engineer will guide the workers to dismantle the goods and install the steel structure components, including: roof system installation, roof beam building, beam room installation, sporadic component installation, steel purlin support tie rod installation, decorative installation and so on.
Compared with the domestic installation plan, the difference is that due to factors such as geographical and cost factors, Chinese Prefab Warehouse Exporters cannot send the entire construction team to the site, but only send engineers to the construction site for guidance. Construction and installation workers hire local professional installation workers to assemble the steel structure. What remains unchanged is our quality control and strict implementation of the planned construction of the steel structure project, which can not only ensure the safety of workers, but also ensure the quality of the steel structure installation.